Sources
Each quote below is copied from a saved copy of its document and checked again, word for word, before every build.
What PUE is, and how it is measured
The recommendations of the Data Center Metrics task force, Version 2, 17 May 2011.
Recommendations for Measuring and Reporting Overall Data Center Efficiency, Version 2: Measuring PUE for Data Centers (17 May 2011). The Data Center Metrics task force (7x24 Exchange, ASHRAE, The Green Grid, Silicon Valley Leadership Group, the U.S. Department of Energy, the U.S. EPA’s ENERGY STAR programme, the U.S. Green Building Council and Uptime Institute), as published by ENERGY STAR. Read on 26 November 2026.
- Section 3
PUE is defined by the following formula: PUE = (Total data center energy consumption or power / IT energy consumption or power)
Cited on the calculator, what PUE is
- Section 3.2, category 0
This is a demand based calculation representing the peak load during a 12-month measurement period. IT power is represented by the demand (kW) reading of the UPS system output
Cited on the calculator, what PUE is
- Section 3.2, category 1
The IT load is represented by a 12-month total kWh reading of the UPS system output
Cited on the calculator, what PUE is
- Section 3.2, category 2
The IT load is represented by a 12-month total kWh reading taken at the output of the PDU's supporting IT loads
Cited on the calculator, what PUE is
- Section 3.2, category 3
The IT load is represented by a 12 month total kWh reading taken at the point of connection of the IT devices to the electrical system.
Cited on the calculator, what PUE is
- Section 4
When publishing PUE, the category must clearly be indicated using a subscript e.g. PUE0, PUE1, PUE2, PUE3. A PUE reported without the subscript is not considered to be in compliance with these recommendations.
Cited on the calculator, what PUE is
- Section 4
Note that PUE0 may only be used for all-electric data centers. It cannot be used for data centers that also use other types of energy (e.g. natural gas, district chilled water, etc.).
Cited on the calculator, what PUE is
- Section 2
Total annual energy is calculated as the weighted sum of the annual energy consumption for all energy types serving the data center at the data center boundary. In a Dedicated Data Center building, this will include all energy captured on utility bills;
Cited on the calculator, what PUE is
- Appendix A
consider two fictitious data centers: Case A is an all electric data center,
Cited on the calculator
- Appendix A, Case A
End-use IT Load Power delivery loss Lighting Cooling Other […] Energy Use 1,000,000 kWh 250,000 kWh 50,000 kWh 400,000 kWh 5,000 kWh
Cited on the calculator
- Appendix A, Case A
Electricity (1,705,000 kWh total) The PUE for Case A would be computed as: PUE = 1,705,000 * (1.0) = 1.70 1,000,000 * (1.0)
Cited on the calculator
- Section 3.4
Therefore, the installation of RE sources does not change the PUE (i.e. an all-grid building and all-RE building would have the same PUE).
Cited on the calculator, what PUE is
- Section 1.3
This document does not address IT efficiency.
Cited on the calculator, what PUE is
- Section 1.1
caution must be exercised when an organization wishes to use PUE to compare different data centers, as it is necessary to first conduct appropriate data analyses to ensure that other factors such as levels of reliability and climate are not impacting the PUE.
Cited on the calculator, what PUE is
- Section 3.3
For data centers that have electricity as well as other energy types, the different energy types must be weighted according to their source energy.
Cited on the calculator, what PUE is
- Section 3
The task force strongly recommends annual energy consumption (kWh) for all energy types as the unit of measure for PUE calculation.
Cited on what PUE is
- Section 3.2, category 1
Annual reading should reflect 12 consecutive months of energy data.
Cited on what PUE is
- Section 2
IT annual energy is calculated as annual electrical consumption of the IT. IT includes all IT equipment, servers, networking and storage as well as telecom equipment typically installed in telecom data centers.
Cited on what PUE is
- Section 2
Total annual energy must include supporting infrastructure and dedicated ancillary services
Cited on what PUE is
- Section 2
Supporting infrastructure includes the following: […] Power systems: Transfer switch, UPS, DC batteries/rectifiers (non UPS – telco nodes), generator, transformer (step down), power distribution unit (PDU), rack distribution unit (RDU), breaker panels, distribution wiring, lighting. […] HVAC systems: […] Physical security: […] Building management systems:
Cited on what PUE is
- Section 1.1
These recommendations represent the collective work of a task force representing 7x24 Exchange, ASHRAE, The Green Grid, Silicon Valley Leadership Group, U.S. Department of Energy Save Energy Now Program, U.S. Environmental Protection Agency’s ENERGY STAR Program, United States Green Building Council, and Uptime Institute.
Cited on what PUE is
The Indian grid’s carbon factor
The Central Electricity Authority’s CO2 Baseline Database for the Indian Power Sector.
CO2 Baseline Database for the Indian Power Sector, User Guide, Version 22.0 (August 2026). Central Electricity Authority, Ministry of Power, Government of India. Read on 26 November 2026.
- Executive summary
The weighted average emission factor of grid electricity declined overall from 0.774 tCO2/MWh in FY 2013-14 to 0.675 tCO2/MWh in FY 2025-26.
Cited on the calculator
- Table S
Table S: Weighted average emission factor, simple operating margin (OM), build margin (BM) and combined margin (CM) of the Indian Grid for FY 2025-26 (adjusted for cross-border electricity transfers) (including RES & Captive power injection into grid), in tCO2/MWh
Cited on the calculator
- Section 4
Weighted average: The weighted average emission factor describes the average CO2 emitted per unit of electricity generated in the grid.
Cited on the calculator
What the calculator adds
Units and grouping
Readings may be typed in kWh or MWh (kW or MW for peak demand), with Indian or Western grouping; figures are printed with Indian grouping.
Rounding
PUE to two decimals, an exact half to the even figure; shares to one decimal; tonnes whole from 10 up.